September 2008

 
Sept2008_1stElectricShovel
   
Sept2008_CrushedMaterialStockpiled
 First electric shovel in operation
 
 Crushed material being stockpiled at plant site
Sept2008_CrushedMaterialStockpiled2
   
Sept2008_CrushedMaterialStockpiledConveyor
 Crushed Material Stockpile
 
 Crushed Material Stockpile and Plant Conveyor System
 
Sept2008_DirectDumpCrushing
   
 Commencement of Direct Dump Crushing
   

Share Price

Symbol Last Trade $ Change
ASX EQN 2.390 +0.425
TSX EQN 2.00 0.00

Copper Price

Price (US$/lb) $ Change
1.512 0.105

ASX and TSX Logos ASX TSX Prices are delayed by at least 20 minutes.
Click a logo to view complete
online share information

Videos

Lumwana Flyover Video 23-May 2008


Contacts

Perth Office

Ground Floor, 50 Kings Park Road
West Perth WA 6005
Tel: +61 (0) 8 9322 3318
Fax: +61 (0) 8 9324 1195

Toronto Office

155 University Avenue, Suite 1701
Toronto, Ontario Canada M5H 3B7
Tel: +1 (416) 865 3393
Fax: +1 (416) 865 3394


Join our mailing list

Click here to join our mailing list and keep up to
date with all the news at Equinox