March 2007

 Mar2007_CrusherFoundations   Mar2007_CrusherTunnelToVault
  Construction of the Primary Crusher foundations
 
 View Crusher Tunnel to Vault
     
 Mar2007_SteelTo1stLiftCrusherVault    Mar2007_BallMillSouthernWallToBeShuttered
 Wall Steel to 1st Lift of Crusher Vault
 
 Ball Mill Southern Wall to be Shuttered
     

 Mar2007_BallMillSouthernWall

 

 Mar2007_CrusherTunnelDischargeEnd

 Ball Mill Southern Wall
 
 Crusher Tunnel Discharge End
     

 Mar2007_HVWorkshopBatchPlantLIA

 

 Mar2007_HVWorkshopTowardsTruckWashBay

 HV Workshop Foreground and Batch Plant LIA
 
 HV Workshop Looking Towards Truck Wash Bay
     

 Mar2007_CoolingTowerComponents

 

 Mar2007_FlocculantMixingTank

 Cooling Tower Components
 
 Flocculant Mixing Tank
     

 Mar2007_MixingAndStorageAgitators

 

 Mar2007_HitachiTruckTrayHalves

Mixing and Storage Agitators
 
Arrival onsite of half sections of the 'bowl' for Hitachi haul trucks
     
 Mar2007_Euclid560tExcavatorArmSmall    
Hitachi EX5500 excavator components arriving on site
   

Share Price

Symbol Last Trade $ Change
ASX EQN 3.680 -0.030
TSX EQN 3.47 +0.10

Copper Price

Price (US$/lb) $ Change
3.480 0.088

ASX and TSX Logos ASX TSX Prices are delayed by at least 20 minutes.
Click a logo to view complete
online share information

Videos

Lumwana Flyover Video 23-May 2008


Contacts

Perth Office

Ground Floor, 50 Kings Park Road
West Perth WA 6005
Tel: +61 (0) 8 9322 3318
Fax: +61 (0) 8 9324 1195

Toronto Office

155 University Avenue, Suite 1701
Toronto, Ontario Canada M5H 3B7
Tel: +1 (416) 865 3393
Fax: +1 (416) 865 3394


Join our mailing list

Click here to join our mailing list and keep up to
date with all the news at Equinox