June 2008

Jun08_ConcentrateStorage
 
 
Jun08_CV03Conveyor
 Concentrate Storage, Larox Building and Reagents
 
 CV03 conveyor with engineered stockpile
 
Jun08_CV03CV04CV05CV06
   
Jun08_FloatCells
 CV03, CV04, CV05 and CV06
 
 Float cells
 
Jun08_TailingsThickener
   
Jun08_PipingBelowCyclones
 Tailings thickener, Process water ponds and water services
 
 Piping below cyclones

Share Price

Symbol Last Trade $ Change
ASX EQN 5.310 -0.060
TSX EQN 5.11 -0.07

Copper Price

Price (US$/lb) $ Change
3.460 0.039

ASX and TSX Logos ASX TSX Prices are delayed by at least 20 minutes.
Click a logo to view complete
online share information


Contacts

Perth Office

Ground Floor, 50 Kings Park Road
West Perth WA 6005
Tel: +61 (0) 8 9322 3318
Fax: +61 (0) 8 9324 1195

Toronto Office

Royal Bank Plaza, South Tower
200 Bay Street, Suite 2940
PO Box 54, Toronto, Ontario
Canada M5J 2J2
Tel: +1 (416) 865 3393
Fax: +1 (416) 865 3394


Join our mailing list

Click here to join our mailing list and keep up to
date with all the news at Equinox